SPECIFICATION

 

FRAME MATERIALS

 

  • Structural timber to be Scandinavian softwood from sustainable sources graded to comply with our consulting engineers requirements.

 

  • Timber treated with preservative in accordance with BS 5268 Part 5 1976 to comply with current Building Regulation requirements.

 

  • Sheathing to be 9mm thick OSB (orientated strand board).

 

  • Structural fixings to be rust proofed.

 

  • All timber and wood based products on this contract will be FSC/PEFC certified.

 

EXTERNAL WALLS

 

  • Manufactured in panels 2400mm nom high 50 x 150mm finished (38 x 140mm stud at 600mm max centres clad with 9mm OSB sheathing).

 

  • Breather membrane to BS4016 1966 pre-fixed to panels at works with nylon tape to indicate stud positions. The breather membrane will be extended at the sides and bottom of panels to form sufficient laps

 

  • Apertures in panels have lintels and cripple studs as specified by our engineer.

 

INTERNAL WALLS

 

  • Manufactured as panels 2400mm nom high 38 x 89mm stud at 600mm max centres with restraining noggins as required.  Apertures formed as required with all necessary lintels and cripple studs incorporated in panels.

 

  • When walls occur along the central axis of the unit they will be manufactured No.2 x 38x50mm studs walls joined together allowing for separation.

 

PLASTERBOARD SUPPORTS AND ADDITIONAL STUDS

 

  • Additional noggins or studs pre-fixed in panels to provide support for plasterboard at all junctions.

 

  • All necessary additional support studs (below trimmers, beams etc) pre-fixed in panels and marked for precise location on site.

 

 

GABLE PANELS

 

  • Manufactured as external or internal walls to match roof profile.

 

CHASSIS AND FLOOR

 

  • NORMAL DOMESTIC LOADING

 

  • Timber Chassis Construction. Primary chassis (to each half of the structure) comprising 135mmx220mm Timber Beam. Bolted to allow separation.

 

  • The secondary floor construction will be 22mm OSB chipboard supported by 45 x 195 joists at 600mm max. centres with 9mm OSB sheathing underneath.

 

  • Insulation in the floor zone will be provided by 200mm Glass-wool Batts.

 

ROOF COMPONENTS 

 

  • The roof construction will comprise 45x145mm Roof Joists supported by a composite Glulam ridge beam in 2x Halves 86x225mm (minimum). Finished in 9mm OSB deck.

 

  • Soffit 15mm WBP Ply

 

  • Bargeboard EXCLUDED
  • Felt and Batten EXCLUDED

 

FIXINGS AND SUNDRY MATERIALS

 

  • All necessary nails, bolts, connectors and fixings provided.

 

  • PVA adhesive provided for tongues on chipboard floors.

 

CLADDING

 

  • Supply and Fit Larch Timber Cladding (Vertical) inc. battens.